You are here: Product groups / Preparatory studies / Ongoing

Ongoing preparatory studies

The following preparatory studies are ongoing and at a varying stage. Please also note the overview over the status quo and the news on details of the preparatory.

If you are looking for further details on the preparatory studies, like draft documents or minutes of stakeholder meetings you will find links to websites of the contractors of the preparatory studies here.

 

(Lot 15) Solid fuel small combustion installations

Draft documents for the first seven tasks are available at the moment.

To top

(Lot 20) Local room heating products

Draft documents of Task 1-6 are available

To top

(Lot 21) Central heating products using hot air to distribute heat

Draft documents of Task 1-6 are available

To top

(Lot 22) domestic and commercial ovens

Draft dokuments of Tasks 1 - 8 are available

To top

(Lot 23) Domestic and commercial hobs and grills

Draft dokuments of Tasks 1 - 8 are available

To top

(ENTR Lot 4) Industrial and laboratory furnaces and ovens

Draft documents of Tasks 1 - 5 are available

To top

(ENTR Lot 5) Machine tools

Tasks 1 - 3 and draft tasks 4 and 5 are available

To top

(ENTR Lot 6) Air-conditioning and ventilation systems

Air Conditioning: Draft documents of Tasks 1 - 5 are available

Ventilation Systems: Draft documents of Tasks 1 - 5 are available; see also the Commission's note for clarification on scope of domestic and non-domestic ventilation

To top