Ongoing preparatory studies
The following preparatory studies are ongoing and at a varying stage. Please also note the overview over the status quo and the news on details of the preparatory.
If you are looking for further details on the preparatory studies, like draft documents or minutes of stakeholder meetings you will find links to websites of the contractors of the preparatory studies here.
(Lot 15) Solid fuel small combustion installations
Draft documents for the first seven tasks are available at the moment.
(Lot 20) Local room heating products
Draft documents of Task 1-6 are available
(Lot 21) Central heating products using hot air to distribute heat
Draft documents of Task 1-6 are available
(Lot 22) domestic and commercial ovens
Draft dokuments of Tasks 1 - 8 are available
(Lot 23) Domestic and commercial hobs and grills
Draft dokuments of Tasks 1 - 8 are available
(ENTR Lot 4) Industrial and laboratory furnaces and ovens
Draft documents of Tasks 1 - 5 are available
(ENTR Lot 5) Machine tools
Tasks 1 - 3 and draft tasks 4 and 5 are available
(ENTR Lot 6) Air-conditioning and ventilation systems
Air Conditioning: Draft documents of Tasks 1 - 5 are available
Ventilation Systems: Draft documents of Tasks 1 - 5 are available; see also the Commission's note for clarification on scope of domestic and non-domestic ventilation
