EuP Network

Index

    Please note that this website is no longer updated as of January 2017. Please visit also other sites covering this topic. We recommend the websites of BAM (German) and eceee (English).

    Completed preparatory studies

    The following preparatory studies have been finalised and final reports are available for download here.

    The final reports either compile the results of all tasks or report on the tasks separately. For a definition of each task, please refer to this overview.

    To visit preparatory webpages, please follow this link to find a list of all pages available.

    (No lot number) Simple set-top boxes

    Task 1-8

    (Lot 4) Imaging equipment

    Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    (Lot 6) Standby and off-mode losses

    Task 1-8 literature & annex

    (Lot 10) residential room conditioning appliances (airco and ventilation)

    Comfort fans Task 1-8

    Residential ventilation Task 1-8 Supplements

    Air conditioning Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    (Lot 11) Electric motors, fans, circulators, pumps

    electric motors Task 1-8

    fans Task 1-8; review study on fans (2015): final report study website

    circulators Task 1-8

    pumps Task 1-8

    (Lot 12) Commercial refrigerators and freezers

    Task 1-8 (2007)

    Additional technical report (JRC) (2014)

    (Lot 13) Household refrigeration

    Preparatory study (2007): Task 1-2 Task 3-5 Annex Task 5 Task 6-7

    Review study (2016): Final report Annex H Technology Roadmap study website

    (Lot 14) Domestic washing machines and dishwashers

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7

    (Lot 15) Solid fuel small combustion installations

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 8

    (Lot 16) Laundry dryers

    Task 1 - 8

    (Lot 17) Vacuum cleaner

    Kapitel 1-8

    (Lot 18) Complex set-top boxes

    Task 1-8

    (Lot 19) Domestic Lighting

    Preparatory study part I+II (2009): Task 1-8 project report

    Review study on the requirements of stage 6 of regulation 244/2009 (2013): Final report

    Review study on light sources (lot 8, 9, 19) (2015): Task 0 Task 1 Annexes Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 study website

    (Lot 20) Local room heating products

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 8

    (Lot 21) Central heating products using hot air to distribute heat

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 8

    (Lot 22) domestic and commercial ovens

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 8

    (Lot 23) Domestic and commercial hobs and grills

    Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 8

    (Lot 24) Professional washing machines, dryers and dishwasher

    Dishwashers: Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    Laundry machines and dryers: Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    (Lot 25) non-tertiary coffee machines

    Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    (Lot 26) Networked standby losses

    Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8

    (Lot 31) Compressors

    Task 1-5 Task 6-8

    (ENTR Lot 1) Professional refrigerated storage cabinets

    Summary Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7

    (ENTR Lot 2) Distribution and Power Transformators

    Task 1-7

    (ENTR Lot 3) Sound and imaging equipment

    Task 1-7

    (ENTR Lot 4) Industrial and laboratory furnaces and ovens

    Tasks 1-7, Appendices

    Air Conditioning: Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7

    Ventilation Systems: Task 1, Task 2, Task 3, Task 4, Task 5, Task 6, Task 7, Task 7 Annex

    See also the Commission's note for clarification on scope of domestic and non-domestic ventilation.