Please note that this website is no longer updated as of January 2017. Please visit also other sites covering this topic. We recommend the websites of BAM (German) and eceee (English).

News

New prep studies ENER Lot 27 to 31 assigned

In the context of the Ecodesign Directive 2009/125/EC the following new preparatory studies have been assigned to the contractors below. The contractors will launch individual websites for stakeholder information and consultation.

  • ENER lot 27: uninterruptible power supplies (UPSs).
    Contractor: AEA Technology plc, UK.
  • ENER lot 28: pumps (extended product approach including motors, VSDs and controls, where appropriate) for private and public waste water (including all stages including buildings, networks and treatment facilities) and for fluids with high solids content.
    Contractor: Bio Intelligence Service, France.
  • ENER lot 29: pumps (extended product approach including motors, VSDs and controls, where appropriate) for private and public swimming pools, ponds, fountains and aquariums, as well as clean water pumps larger than those regulated under lot 11. Contractor: Bio Intelligence Service, France.
  • ENER lot 30: products in motor systems outside the scope of the Regulation 640/2009 on electric motors, such as special purpose inverter duty motors (asynchronous servo motors), permanent magnet motors, motors cooled by their load (fans), including motors and products under Article 1, points 2(b), (c) and (d) and including drives, such as soft starters, torque or variable speed drives (VSDs) from 200 W1 000 kW. The study should also cover motors in the scope of the Regulation 640/2009 from 750 kW1 000 kW.
    Contractor: ISR-University of Coimbra (ISR-UC), Portugal.
  • ENER lot 31: products in motor systems outside the scope of the lot 30 and the Regulation 640/2009 on electric motors, in particular compressors, including small compressors, and their possible drives.
    Contractor: Van Holsteijn en Kemna BV, NL.