The final draft report on task 8 within the Ecodesign preparatory study on Uninterruptible power supplies (ENER Lot 27) has been published on the project website.
Feedback can be sent to the study consortium by 7th February 2014.
The final draft report on task 8 within the Ecodesign preparatory study on Uninterruptible power supplies (ENER Lot 27) has been published on the project website.
Feedback can be sent to the study consortium by 7th February 2014.